top of page

How a Couple's Sketch Became a Permit Set in North Fort Myers

Michael D. Stewart, P.E.
4 days ago
4 min read

A couple in North Fort Myers came to us wanting a one-story home with an oversized three-car garage, big enough for the large vehicles they drive. They sent a house plan they liked, their own sketch drawn on top of it, a picture of a house whose look they liked, and the survey of their property.

That was enough to start. They followed up with a list of details they had been thinking about: block walls, ceiling heights, door sizes. Our answer was short: don't worry about the detail at this stage. We draw it up, send it to you, and that is when we work out the details together.

What happened when they saw the drawings

The first design set went out as a PDF: a one-story concrete block home with stucco, a stone base and a standing-seam metal roof (a metal roof with raised seams), an oversized side-load garage (its doors face the side, not the street), and covered front and rear porches. We asked two things. Is the house where you want it on the property? And please mark up the drawings, by hand on a printout if that is easier, and send us a phone photo.

They did exactly that. Seeing the plan drawn changed a few of their ideas, which is exactly what a first set is for. A room changed use, the master bath grew, windows shifted so the furniture would fit the way they live, and the laundry picked up pantry space. They marked their changes in red on a printout and sent a photo of the property showing where they wanted the house to sit.

The other big change was the outside. The first version was a simple Florida look, and they wanted more of a farmhouse feel, like the picture they had sent at the start. The next set had three peaks across the front, each with a stained cedar decorative truss.

Later, looking at the drawings again, they asked whether two posts in the middle of the rear porch could go so the porch would be open. We said yes. Details like that often only come up once people see them drawn, and that is fine.

They also found what works for a lot of our clients: rather than describe a house in writing, make your changes, sit on them for a day, then send them all at once with photos and marked-up pages.

Picking the spot on the property

The lot is a large rural property, and like many larger lots in Lee County, the flood map does not treat all of it the same. Part of the property sits in a flood zone and part sits outside it. The house went on the part outside the flood zone, on the spot the owners chose, clear of what was already on the land.

Their survey was older than some of the things built on the property since, so our site plan shows those from the County's aerial maps and notes that a current survey is needed for the permit.

What came out the other end

The finished set was signed and sealed by Michael D. Stewart, P.E.: site plan, floor and dimension plans, roof plan, all four elevations, building and wall sections, the electrical plan, and the structural sheets.

A new house in Florida also needs an energy code calculation for the permit. This one got the performance-method energy calculation (Form R405, a computer model of the house's yearly energy use checked against the code), which passed, and a Manual J load calculation, the heating and cooling loads the air conditioning is sized from. Both went to the owners with the drawings, ready to submit to Lee County.

What this means for you

You do not need a finished plan to start a custom home. A sketch, a picture you like and a survey are a real starting point. The details get settled on paper, in rounds, once there is a drawing to react to. Changing your mind when you see the drawing is normal. That is what a first design set is for.

What to do

  1. Send what you have. A plan from a magazine or website, your sketch on top of it, photos of houses you like, and your survey. Tell us the size you want and how you will use the house: big vehicles, a workshop, a room for the grandkids.

  2. Get a current survey. If buildings, a pond or drives went in after your last survey, the permit may need a new one. Ask your designer and order it early.

  3. Find your flood zone before you pick the spot. On a large lot the flood line can run right through the property. Where the house sits can change which flood rules apply to it.

  4. Mark up the drawings by hand. Print the PDF, write on it in red, take a photo with your phone. Batch your changes into one email.

  5. Walk through the drawings slowly. Picture the posts, the window heights, where the furniture goes. Small things are easiest to change on paper.

  6. Mind the code date. The 9th Edition of the Florida Building Code takes effect December 31, 2026. The date of a complete permit application decides which edition your house is reviewed under (before that date, the 8th Edition), so plan your submittal date with your designer.

Frequently asked questions

Do I need a full floor plan before I call?

No. On this job the owners started with a plan they liked, a sketch over it and a photo of the look they wanted. That is enough for a first design set.

Do we have to meet in person?

No. On this job the owners sent notes and marked-up pages by email, and we sent back drawings. A meeting or site visit was not required, though you can always call.

What happens if I change my mind after I see the drawings?

That is normal. The first set is there so you can react to something real. Send your changes together, with photos or a marked-up page, and we will talk them through with you.

How long does it take?

We offer unmatched turnaround times, and 5-7 day rush turnaround is available upon request for a premium fee.

Planning a new home in Fort Myers or North Fort Myers? See our Fort Myers structural engineering page, send us your sketch through our contact page, or call 239.292.7670.

 
 
 

Comments


bottom of page