We have never lost a structure to a hurricane.
Send Message
Assembly buildings, the places where people gather, carry the most engineering of any building type: more people, more exits, more fire protection and more equipment. Michael D. Stewart, P.E., LLC provides structural, MEP and fire protection engineering and building design for churches, restaurants, bars, nightclubs, event venues and clubhouses across Southwest Florida, signed and sealed for permit.
Churches and places of worship
Restaurants and commercial kitchens
Bars, brewpubs and nightclubs
Event venues and clubhouses
Change of occupancy
Signed and sealed for permit
Churches and Places of Worship
New sanctuaries, fellowship halls, additions, pavilions and renovations, from structure and wind design to the air conditioning, lighting, sound power and fire alarm a full sanctuary needs.
Restaurants and Commercial Kitchens
Restaurant build-outs and renovations: kitchen hoods and exhaust, grease interceptors, gas piping, walk-in coolers, plumbing fixture counts and the electrical service to run it all, coordinated so the health department, the fire marshal and the building department all sign off.

Bars, Brewpubs and Nightclubs
Bars, tap houses, brewpubs and nightclubs: occupant load and exits, fire alarm and fire sprinkler systems, ventilation for a full room, brewing and draft equipment, and outdoor bars and patios.

Event Venues, Banquet Halls and Clubhouses
Banquet halls, event spaces, community centers and country club clubhouses, including pool bars, cabanas and outdoor kitchens.

Change of Occupancy to Assembly
Turning a retail space, office or warehouse into a church, restaurant, gym or event venue is a change of occupancy, and it brings the whole building into review: exits, restrooms, accessibility, fire protection, ventilation and the structure. We tell you early what the change will take.
Our Project History
Over more than two decades, Michael D. Stewart, P.E.'s project history includes dozens of churches and chapels and dozens of restaurants, along with bars, brewpubs, tap houses and nightclubs, a performing arts theater addition, country club clubhouses and pool bars, banquet and community halls, and gyms and fitness centers across Naples, Fort Myers, Bonita Springs, Cape Coral, Punta Gorda and Sarasota. See our MEP engineering page for the systems side.

"I TREAT EACH AND EVERY PROJECT
AS A PERSONAL PRIORITY."
Where We Work and Turnaround
Lee, Collier, Charlotte and Sarasota counties. We offer unmatched turnaround times, and 5-7 day rush turnaround is available upon request for a premium fee. Call or text (239) 292-7670.
Frequently Asked Questions
Is a restaurant or a church an assembly occupancy?
Yes. Restaurants, bars and nightclubs are assembly occupancies, and so are churches, along with banquet halls, gyms and community centers. The occupant load decides much of what the building needs.
Does a bar or nightclub need fire sprinklers?
Often, depending on its size, occupant load and where it sits in the building. We determine what applies and design it.
Can you engineer a restaurant in a space that was retail?
Yes. That is a change of occupancy, and we handle the whole building review it triggers, along with the kitchen and MEP design.
Do you work with the owner's architect or designer?
Yes. We provide the structural and MEP engineering on plans drawn by others, or the full permit set.
Contact
Send Message
Call (239) 292-7670
Email mstewart@mstewartpe.com
Use our contact form and tell us about your project.
Michael D. Stewart, P.E., LLC
FL REG#: 72459 / CA REG#: 33003
PHONE: (239) 292-7670
EMAIL: MStewart@MStewartPE.com
SOCIAL:













